When the Rural Electrification Administration began in 1935, only 2.3 percent of Texas farms had central-station power. It became a lending agency within months, Congress made that permanent in 1936, and groups of farmers and ranchers organized cooperatives to borrow. The Handbook of Texas says Bartlett's 58-mile line, energized March 9, 1936, is claimed as the first REA project in the nation. By 1966 the loans had financed seventy-seven distribution systems and two generation and transmission cooperatives. By 1965 only 2 percent of Texas farms were still without electricity, the reverse of the 1935 figure.

What the plaque says

Brazos River Transmission Electric Cooperative The first generation and transmission electric cooperative in Texas, this corporation was organized in February 1941 by eleven small electric cooperatives which had been established under the rural electrification administration. With a goal of providing affordable wholesale power costs and improved service to its members, the cooperative first established offices in Fort Worth. In 1945 the headquarters were moved to Waco, and service eventually was extended to a large area of central and North Texas. (1991)

Where it stands

31.46959, -97.18139 · Directions

Worth the stop nearby

More markers nearby

← All historical markers