Collis P. Huntington laid out his city in 1871 at Holderby's Landing, where his Chesapeake & Ohio trains could meet the Ohio River's boats. The river came into town in 1884 and again in 1913, and the Chief of Engineers would later tell Congress that Huntington had flooded 23 times in 55 years. Each time, residents shoveled out the mud and opened again.
Nineteen days of rain
January 1937 was unusually warm. Melting snow and 19 straight days of rain filled the Ohio along its whole 981 miles from Pittsburgh to Cairo, Illinois. Upstream at Parkersburg, police and firemen reached City Hall by boat. At Ashland, Kentucky, just below the state line, the flow was measured at about 690,000 cubic feet per second, the greatest flood flow in West Virginia's records.
At Huntington the river reached 69.45 feet, more than 19 feet above flood stage and about three feet over the 1913 mark; accounts put the crest on January 27 or 28. Most of downtown went under, the business district to an average depth of 11 feet. Rowboats moved along Fourth Avenue. Thousands left their homes, and relief centers in churches and schools fed as many as 9,000 people a day. When the water went down, five people in the city were dead. Across the valley the flood drove about a million people from their homes and killed nearly 400.
The Chamber's wall
On February 18, with the water still falling, Col. Joseph H. Long, publisher of the Huntington Advertiser and president of the Chamber of Commerce, appointed a committee to study a floodwall. On June 15 he went to Washington with the Chamber's managing director, Dr. W. S. Rosenheim, and City Engineer John S. Gillespie. Before the House Committee on Flood Control, Chief of Engineers Edward Markham showed photographs of the flooded city and put local business losses above $14 million. Rosenheim promised that Huntington would supply the land "if necessary."
Congress agreed to build a wall if the city provided the rights-of-way. City Council sold bonds to buy the land and set a floodwall tax on every property the wall would protect. Opponents sued. The Cabell County Circuit Court upheld the plan, and on April 9, 1938, so did a unanimous state Supreme Court.
Eleven miles
Work on the Huntington section began on August 1, 1938, and was finished in 1940. When the war halted most of the Corps of Engineers' civil works, the Guyandotte section went ahead, because it guarded the International Nickel Company plant, which the 1937 flood had shut for six weeks and which was now doing war work. The wall was completed in 1943, about 11 miles in all, and that year it turned back an estimated $3 million in damage. The Corps has put its savings since at $238.8 million. A bronze plaque at the 10th Street gate credits the Chamber.
The wall also hid the river, and for four decades the city largely forgot it was there, until David W. Harris Riverfront Park opened in 1984. The Corps later dammed the forks of Twelvepole Creek south of the city, at East Lynn Lake in the 1960s and Beech Fork State Park in the 1970s.